Padel court builders in the US fall into three groups: court manufacturers who install their own product, established tennis and sports surface contractors who have added padel, and general contractors taking on their first court. All three can do good work. Only one of them has done it before on a site like yours.

Tell us where the project is and we pass it to the single builder holding that region. Not five. Not a bidding pool.

The short version

What should I ask a padel court builder?

Ten questions. They take ten minutes and they turn three incomparable totals into three comparable ones.

  • Which Incoterm is the kit priced on? EXW leaves freight, insurance, duty and haulage with you. DDP includes them. This one question explains most of the gap between quotes that otherwise look identical.
  • Who owns the slab? Some padel court builders quote supply and erect only, assuming you deliver a finished, level, load-rated slab. Others price the groundwork. The difference is five figures.
  • How many padel courts have you completed, and where? Ask for addresses, not photographs. Photographs come from the manufacturer's library.
  • Who does the actual installation? Their own crew, a subcontractor, or a crew flown in by the manufacturer. All are workable. You want to know which, because it decides who returns for a warranty claim.
  • What is the lead time from deposit to delivery? Courts are manufactured to order, mostly abroad, and shipped by sea. A vague answer here usually means they have not placed the order with the factory yet.
  • What does the structural warranty actually cover, and who honours it? A warranty from a factory with no US entity is harder to enforce than one from the company standing in front of you.
  • What gauge is the steel and what corrosion class is the coating? Ask for the millimetre thickness and the ISO 12944 class by name. C5 is the class rated for marine and heavy industrial exposure. "Galvanised" on its own is not an answer.
  • What wind speed is the structure rated to, in mph? A number, on paper, for the model you are being quoted. Coastal and hurricane-zone counties will ask for it before they will ask you anything else.
  • Who carries the permit application, and have you checked zoning? These are two separate approvals and people conflate them. Zoning decides whether a court is allowed on that parcel at all; the building permit decides whether the structure passes. A builder should supply stamped CAD drawings and wind-load calculations for the permit, and should have raised zoning before you signed anything.
  • Are you licensed and insured in this state, and can I see the certificates? Ask for the certificate of insurance directly from the insurer, not a PDF.

Reference

What does a good specification look like?

Use this as the row you measure a quote against. These are the figures currently offered by established US padel court builders, so a quote that falls short of them should come with a reason.

Compiled August 2026 from published specifications of US padel court manufacturers and installers. Court geometry follows the International Padel Federation Rules of Padel. Figures are the current market reference, not a regulatory minimum.
ItemReference standardWhy it matters
Steel gauge3–4 mm Frame rigidity and how the glass sits over time
Corrosion coatingC5, ISO 12944 The class rated for marine and heavy industrial exposure
Structural warranty10 years Currently the longest coverage offered in the US market
Wind ratingstated in mph, per model Required by coastal and hurricane-zone jurisdictions
Glass10–12 mm tempered Structural as well as visual; thickness is a real cost line
Permit packstamped CAD plus wind-load calcs Without it your permit application stalls
Court geometry20 × 10 m, ±0.5% FIP specification; outside it, no sanctioned play

Coastal projects: most manufacturers offer a climate-rated model built for wind, salt air and extreme heat, with upgraded coatings and anchoring. Within sight of salt water that is the specification rather than an upgrade, and a builder who does not raise it has not thought about your site.

Is there a certification for court builders?

Yes, though not padel-specific. The American Sports Builders Association runs a Certified Builder program and maintains a public member directory of sports facility builders, designers and suppliers, along with published construction guidelines for courts.

ASBA certification tells you a contractor works to recognised standards on sports surfaces generally. It does not tell you they have erected a 4 metre glass and steel enclosure, because padel is newer than the certification. Treat it as a strong signal on the groundwork and a neutral one on the structure, and ask the completed-court question separately.

The FIP publishes the court specification itself in the Rules of Padel. Any builder should be able to talk fluently about the 20 by 10 metre footprint, the 0.5% tolerance and the 6 metre indoor clearance without looking them up.

What should make me walk away?

Four things, in rough order of how much they should worry you.

  • A total with no scope behind it. A single number with no breakdown of kit, slab, freight and lighting is not a quote, it is an opening position.
  • Reluctance to survey before pricing. Nobody can price groundwork from a photograph. A builder quoting a slab sight-unseen is either guessing or planning to reprice later.
  • A deposit above the industry norm with no manufacturing milestone. Deposits are normal because courts are made to order. A deposit that is not tied to a factory order date is not.
  • No answer on the warranty chain. If nobody can tell you who replaces a cracked panel in year three, assume the answer is you.

How this works

How do you match me with a builder?

You send the site details. We pass them to the one builder holding your region and they contact you directly, usually within a business day. We are not in the middle of the quote, the contract or the build.

  1. You describe the site

    Location, court count, indoor or outdoor, and whether a slab already exists. Two minutes, no phone call required.

  2. We check the territory

    One builder holds each region. If nobody covers yours, we say so rather than routing you to a company two states away.

  3. They contact you directly

    No bidding pool, no call centre, and your details are not resold to anyone else.

Padel court project timeline from decision to opening Five phases: survey and design two to six weeks, zoning and permitting four to sixteen weeks, factory lead time and shipping eight to sixteen weeks, slab and curing two to four weeks, installation and commissioning one to two weeks. Permitting and factory lead time overlap and are the variables. Total is four to nine months. DECISION TO OPENING — 4 TO 9 MONTHS SURVEY ZONING + PERMITS FACTORY + SHIPPING SLAB INSTALL 2–6 wk survey and design · 4–16 wk zoning and permitting · 8–16 wk manufacture and sea freight 2–4 wk slab and cure · 1–2 wk erection and commissioning Permitting and factory lead time run in parallel and are the variables. The erection itself is quick once the kit is on site and the slab has cured.
Fig. 01 — Where four to nine months actually goes. Anyone quoting you a build time without asking about your jurisdiction has not checked.

Disclosure: CourtBaseline is funded by the builders who hold each region. They pay a fixed monthly fee for territory access. They do not pay per enquiry, per quote or per contract signed, and no builder pays to influence what we publish about costs, specifications or their competitors. We check that a builder is trading, insured and has completed comparable work before signing a territory agreement. We do not supervise their work or warrant it, and you should satisfy yourself independently before contracting with anyone.

Which regions have a padel courts installation partner?

Coverage follows the market. Florida holds roughly 41% of all US padel courts, ahead of Texas at 18%, California at 10% and New York at 4.7%, so those regions were allocated first.

If your region is unallocated we will tell you plainly and, if you want, notify you when a builder takes it on. We would rather say nobody covers Nebraska yet than hand your project to a company that has never worked there.

If you build courts: one company holds each region and territories are allocated on request. Write to [email protected] with the states or metros you cover, the number of courts you have completed, and who insures you. See how this is funded.

Common questions

Padel court builders, answered

How many builders will contact me?
One. Your details go to the single company holding your region and nowhere else. We do not resell enquiry data, we do not run a bidding pool, and you will not spend the following week fielding calls from five contractors who each know they are one of five.
Does the padel court installation include the slab?
Sometimes, and you must ask. Some builders quote supply and erect only, assuming you provide a finished, level, load-rated slab. Others price the full groundwork. Groundwork is the largest uncontrolled cost on a new site, so a quote that excludes it is not comparable to one that includes it.
Can a general contractor build a padel court?
A competent general contractor can pour the slab and manage the site, and many projects work that way with the manufacturer's crew erecting the structure. What a first-time contractor cannot give you is judgement on panel handling, anchor tolerances and glass alignment, where mistakes are expensive and visible. Split the scope deliberately rather than by accident.
Should I buy direct from a manufacturer instead?
You can, and some manufacturers sell and install directly in the US. Buying direct means you carry freight, customs clearance, inland haulage and coordination with whoever pours the slab. That is a real project management job. It is worth doing if you have the capacity and worth avoiding if you do not.
I searched padel court construction near me and got nothing. Why?
Because there are only a few dozen companies doing padel courts installation in the United States and most of them work regionally rather than locally. A search for padel court construction near me will usually return tennis contractors or manufacturers overseas. Tell us the ZIP code instead and we will tell you who actually covers it, or that nobody does yet.
Is a portable padel court an option?
Yes, and it is worth asking about. Some US suppliers offer portable courts designed to be assembled and dismantled quickly, which suits indoor sports facilities, parks, events and leased sites where a permanent slab is not possible. They still need a level, load-bearing base. Ask what the assembly and dismantle time actually is and whether the structure is rated for repeated cycles.
How long does the build take?
Four to nine months from decision to opening is the range most projects fall into. Permitting and factory lead time are the variables, not the erection itself, which is quick once the kit is on site and the slab has cured.
What does this cost me?
Nothing, at any point. Builders holding a region pay a fixed monthly fee for territory access, which is how the site is funded. Because the fee is fixed rather than charged per enquiry or per signed contract, nobody here has an incentive to push you toward a larger project than you need.

Start here

Tell us about the site

Two minutes. One builder who covers your region. No cost to you and no bidding pool.

Send project details